If we think you should walk away, we will say so. Free first pass, answered in two working days ·  Send a site
Land PassIndependent land checks

Councils · England

Nuneaton and Bedworth: housing land supply and delivery

Nuneaton and Bedworth delivered 221% of the homes it needed in the three years to 31 March 2025. That passes the test and carries no consequence, so whether the unmet-need route opens turns on the five-year supply.

221%

Housing Delivery Test 2025

2,866 homes delivered against 1,298 required, 2022-23 to 2024-25

95% or more: no consequence

Housing Delivery Test 2025

Homes needed and homes built

YearHomes requiredHomes built
2022-234351,006
2023-244421,016
2024-25421844
Three years1,2982,866

Source: Housing Delivery Test: 2025 measurement, Ministry of Housing, Communities and Local Government, results table (ODS), published 17 August 2026. gov.uk rounds each result to the nearest 1%; the figures here are as published.

At planning committee

Committee approval rate

Committee approval rate

Not available

Searchland’s export carries no committee decisions for Nuneaton and Bedworth.

Source: Searchland, Committee Explorer, authority export, read 27 October 2026.

The committee approval rate is the share of decisions taken at the council’s planning committee that were approved, in Searchland’s Committee Explorer data. Most applications are decided by officers under delegated powers and never reach the committee, so it is not the council’s overall approval rate, and it is not the chance that a particular site gets permission. The number of decisions behind each rate is given, so that a high rate on a handful of decisions is read for what it is.

From the council’s own documents

Supply, plan and levy

Printed only where Land Pass has read the council’s own document. Each one gives its source and date, and a figure more than a year old says so.

Five-year housing land supply

10.2 years

At 1 April 2026, five years or more on the council’s own figure. The figure is measured against the adopted Borough Plan Review requirement of 545 homes a year, reduced for past over-supply, and includes a 20% buffer.

Source: Five-Year Housing Land Supply Calculation – 1st April 2026.

Local plan

Borough Plan Review (2021-2039)

Adopted 10 December 2025.

The council must start a new local plan under the new plan-making system because the Borough Plan Review does not meet the housing need threshold. It published its notice of intention on 29 June 2026 and held a scoping consultation and call for sites from 29 June to 10 August 2026. It expects to pass Gateway 1 and start the 30-month process on 30 October 2026, with a draft plan consultation in summer 2027 and a final consultation in spring 2028.

Sources: the adopted plan; New Local Plan – Nuneaton and Bedworth Borough Local Plan page, read 24 October 2026; notice of intention published 29 June 2026. Status checked 24 October 2026.

Community Infrastructure Levy, 2026

No CIL in force

Nuneaton and Bedworth does not charge CIL and secures contributions through Section 106 agreements.

Source: Community Infrastructure Levy page (Section 106 and CIL), Nuneaton and Bedworth Borough Council.

Under the NPPF

What the result means for a site

The National Planning Policy Framework in force since 17 August 2026. The policy text is quoted word for word.

A result of 95% or more carries none of the Framework's consequences. The test on its own does not deem an unmet need for housing to exist.

On the council’s own figure of 10.2 years (below) the council can demonstrate a five-year supply, so the unmet-need route in policy S5(1)(j) is not open on supply either. Supply figures are often contested at appeal, and a later finding can differ.

The Borough Plan Review (2021-2039) was adopted on 10 December 2025. Until 10 December 2030, a local housing need figure above the plan's requirement is not, by itself, evidence of unmet need.

“Where a local planning authority can demonstrate a five year supply of deliverable housing sites (with the appropriate buffer) and where the Housing Delivery Test indicates that the delivery of housing is more than 75% of the housing requirement over the previous three years, for the purposes of policy S5(1)(j), if the most up-to-date local housing need figure (calculated using the standard method set out in Annex D) is greater than the housing requirement set out in adopted development plan policies, this should not be considered as evidence of unmet need, for a period of five years from the date of the plan's adoption.”

NPPF, Annex A, paragraph 3, page 99

In the Green Belt

Policy S5 does not apply in the Green Belt. There the grey belt route in policy GB7(1)(g) needs an evidenced unmet need for the type of development, and footnote 41 defines it for housing as no five-year supply, including any buffer, or a Housing Delivery Test result below 75%.

“Which, in the case of applications involving the provision of housing, means the lack of a five year supply of deliverable housing sites, including the relevant buffer where applicable, or where the Housing Delivery Test result was below 75% of the housing requirement over the previous three years;”

NPPF, Footnote 41, page 63

What it does not do

None of this makes a particular site acceptable. Under policy S5(2), a proposal that fails one of the national policies saying development should be refused in specific circumstances is likely to have its benefits substantially outweighed.

“In applying this policy, the circumstances in which the benefits of approving development proposals are likely to be substantially outweighed by adverse effects include, but are not restricted to, situations where the development proposal would fail to comply with one of the national decision-making policies which state that development proposals should be refused in specific circumstances.”

NPPF, Policy S5(2), page 26

Across the boundary

Councils next to Nuneaton and Bedworth

A site near the edge of Nuneaton and Bedworth may sit in a neighbouring council, and the figures can differ sharply across the line. Each name opens that council’s page.

CouncilHDT 2025Five-year supplyCommittee approval rate
Coventry47% Under 75%: unmet need deemed5.91 years at 31 March 202584% of 624
Hinckley and Bosworth134% 95% or more: no consequenceNot yet checked71.2% of 566
North Warwickshire164% 95% or more: no consequence1.5 years at 31 March 202584% of 106
Rugby187% 95% or more: no consequence3.4 years at 1 April 202581.9% of 287

Councils that share a boundary with Nuneaton and Bedworth on the Office for National Statistics’ December 2024 local authority boundaries. Sources for each figure are on each council’s page.

Check a site in Nuneaton and Bedworth

Send the site and the first pass reads it against these figures, the settlement boundary, the Green Belt and flood maps, and the decisions on the land around it. Free, within two working days.

Check a site in Nuneaton and Bedworth

Every figure on this page comes from the source linked beside it, as at the date given. Nothing is rounded up. Page built 30 October 2026 from the Housing Delivery Test 2025 results, Searchland’s Committee Explorer export and Land Pass’s council fact-pack. It is decision support, not planning advice.