If we think you should walk away, we will say so. Free first pass, answered in two working days ·  Send a site
Land PassIndependent land checks

Councils · England

Reading: housing land supply and delivery

Reading delivered 136% of the homes it needed in the three years to 31 March 2025. That passes the test and carries no consequence, so whether the unmet-need route opens turns on the five-year supply.

136%

Housing Delivery Test 2025

2,922 homes delivered against 2,146 required, 2022-23 to 2024-25

95% or more: no consequence

Housing Delivery Test 2025

Homes needed and homes built

YearHomes requiredHomes built
2022-23690926
2023-246901,053
2024-25766944
Three years2,1462,922

Source: Housing Delivery Test: 2025 measurement, Ministry of Housing, Communities and Local Government, results table (ODS), published 17 August 2026. gov.uk rounds each result to the nearest 1%; the figures here are as published.

At planning committee

Committee approval rate

Committee approval rate

87.6%

Of 283 decisions taken at Reading’s planning committee in Searchland’s data, 87.6% were approved.

Source: Searchland, Committee Explorer, authority export, read 27 October 2026.

The committee approval rate is the share of decisions taken at the council’s planning committee that were approved, in Searchland’s Committee Explorer data. Most applications are decided by officers under delegated powers and never reach the committee, so it is not the council’s overall approval rate, and it is not the chance that a particular site gets permission. The number of decisions behind each rate is given, so that a high rate on a handful of decisions is read for what it is.

From the council’s own documents

Supply, plan and levy

Printed only where Land Pass has read the council’s own document. Each one gives its source and date, and a figure more than a year old says so.

Five-year housing land supply

3.55 years

At 31 March 2025, under five years on the council’s own figure. The figure is measured against the standard method as at 31 March 2025 with a 5% buffer and includes student and older people's housing, which the council treats as its official position; counting ordinary homes only, the figure is 3.43 years.

Source: Annual Monitoring Report 2024-25, published January 2026.

Local plan

Reading Borough Local Plan

Adopted 4 November 2019.

Reading is carrying out a partial update of its Local Plan, covering around half of its policies and looking ahead to 2041. The update was submitted for examination on 9 May 2025, with hearings in November 2025 and February 2026. A consultation on the Inspector's main modifications started in September 2026.

Sources: the adopted plan; Local Plan page, Reading Borough Council, last updated 21 October 2026. Status checked 24 October 2026.

Community Infrastructure Levy, 2026

Residential, per m²

Homes, sheltered housing and student accommodation, borough-wide£188.28

One borough-wide residential rate applies in 2026; care homes are charged nothing.

Source: Annual CIL Rate Summary 2026, on the council's Community Infrastructure Levy page.

Under the NPPF

What the result means for a site

The National Planning Policy Framework in force since 17 August 2026. The policy text is quoted word for word.

A result of 95% or more carries none of the Framework's consequences. The test on its own does not deem an unmet need for housing to exist.

The unmet-need route in policy S5(1)(j) is still open in Reading, because the council’s own figure is under five years of supply (below). Policy S5(1)(j) applies where the council “cannot demonstrate a five year supply of deliverable housing sites or scores below 75% in the most recent Housing Delivery Test”.

In the Green Belt

Policy S5 does not apply in the Green Belt. There the grey belt route in policy GB7(1)(g) needs an evidenced unmet need for the type of development, and footnote 41 defines it for housing as no five-year supply, including any buffer, or a Housing Delivery Test result below 75%.

“Which, in the case of applications involving the provision of housing, means the lack of a five year supply of deliverable housing sites, including the relevant buffer where applicable, or where the Housing Delivery Test result was below 75% of the housing requirement over the previous three years;”

NPPF, Footnote 41, page 63

What it does not do

None of this makes a particular site acceptable. Under policy S5(2), a proposal that fails one of the national policies saying development should be refused in specific circumstances is likely to have its benefits substantially outweighed.

“In applying this policy, the circumstances in which the benefits of approving development proposals are likely to be substantially outweighed by adverse effects include, but are not restricted to, situations where the development proposal would fail to comply with one of the national decision-making policies which state that development proposals should be refused in specific circumstances.”

NPPF, Policy S5(2), page 26

Across the boundary

Councils next to Reading

A site near the edge of Reading may sit in a neighbouring council, and the figures can differ sharply across the line. Each name opens that council’s page.

CouncilHDT 2025Five-year supplyCommittee approval rate
South Oxfordshire171% 95% or more: no consequence3.98 years at 1 April 202679.3% of 947
West Berkshire114% 95% or more: no consequenceNot yet checked71% of 655
Wokingham100% 95% or more: no consequence2.5 years at 31 March 202591.5% of 340

Councils that share a boundary with Reading on the Office for National Statistics’ December 2024 local authority boundaries. Sources for each figure are on each council’s page.

Check a site in Reading

Send the site and the first pass reads it against these figures, the settlement boundary, the Green Belt and flood maps, and the decisions on the land around it. Free, within two working days.

Check a site in Reading

Every figure on this page comes from the source linked beside it, as at the date given. Nothing is rounded up. Page built 30 October 2026 from the Housing Delivery Test 2025 results, Searchland’s Committee Explorer export and Land Pass’s council fact-pack. It is decision support, not planning advice.