Councils · England
Vale of White Horse: housing land supply and delivery
Vale of White Horse delivered 192% of the homes it needed in the three years to 31 March 2025. That passes the test and carries no consequence, so whether the unmet-need route opens turns on the five-year supply.
192%
Housing Delivery Test 2025
3,699 homes delivered against 1,922 required, 2022-23 to 2024-25
95% or more: no consequenceHousing Delivery Test 2025
Homes needed and homes built
| Year | Homes required | Homes built |
|---|---|---|
| 2022-23 | 661 | 1,338 |
| 2023-24 | 628 | 1,168 |
| 2024-25 | 633 | 1,193 |
| Three years | 1,922 | 3,699 |
Source: Housing Delivery Test: 2025 measurement, Ministry of Housing, Communities and Local Government, results table (ODS), published 17 August 2026. gov.uk rounds each result to the nearest 1%; the figures here are as published.
At planning committee
Committee approval rate
Committee approval rate
89.5%
Of 996 decisions taken at Vale of White Horse’s planning committee in Searchland’s data, 89.5% were approved.
Source: Searchland, Committee Explorer, authority export, read 27 October 2026.
The committee approval rate is the share of decisions taken at the council’s planning committee that were approved, in Searchland’s Committee Explorer data. Most applications are decided by officers under delegated powers and never reach the committee, so it is not the council’s overall approval rate, and it is not the chance that a particular site gets permission. The number of decisions behind each rate is given, so that a high rate on a handful of decisions is read for what it is.
From the council’s own documents
Supply, plan and levy
Printed only where Land Pass has read the council’s own document. Each one gives its source and date, and a figure more than a year old says so.
Five-year housing land supply
5.26 years
At 1 April 2026, five years or more on the council’s own figure. The figure is measured against local housing need of 970 homes a year plus a 5% buffer, and the council has published a separate statement measured against the housing requirement in the emerging Joint Local Plan.
Source: Housing Land Supply Statement for the Vale of White Horse, published September 2026.
Local plan
Vale of White Horse Local Plan 2031 Part 1: Strategic Sites and Policies
Adopted 14 December 2016. The Local Plan 2031 Part 2: Detailed Policies and Additional Sites was adopted by Full Council on 9 October 2019.
South Oxfordshire and Vale of White Horse submitted their Joint Local Plan 2041 for examination on 9 December 2024. The examination is still running, and a third stage of hearing sessions starts on 17 November 2026. The two councils have also begun a second plan, the Joint Local Plan 2045, under the new system: the notice was published on 19 June 2026, a scoping consultation ran from 8 to 29 September 2026, and the timetable shows submission on 31 October 2028 and adoption on 30 April 2029.
Sources: the adopted plan; Joint Local Plan 2041 Examination page (latest entry 20 October 2026); Joint Local Plan 2045 Timetable page (timetable takes effect from 19 June 2026), https://www.southandvale.gov.uk/joint-local-plan-2045-timetable/. Status checked 25 October 2026.
Community Infrastructure Levy, 2026
Residential, per m²
| Homes, major schemes (10 dwellings and more), Zone 1 Eastern Parishes | £336.34 |
| Homes, major schemes (10 dwellings and more), Zone 2 Built up areas of Wantage, Grove and Faringdon | £120.12 |
| Homes, major schemes (10 dwellings and more), Zone 3 Rest of District | £240.24 |
| Homes, minor schemes (9 dwellings and fewer), Zone 1 Eastern Parishes | £408.41 |
| Homes, minor schemes (9 dwellings and fewer), Zone 2 Built up areas of Wantage, Grove and Faringdon | £192.19 |
| Homes, minor schemes (9 dwellings and fewer), Zone 3 Rest of District | £312.31 |
| Strategic Sites | £0 (nil) |
| Residential rural exception site | £0 (nil) |
These are the indexed rates for permissions granted in 2026 under the charging schedule in force since 1 November 2021; the summary says the exact charge should be worked out with the indexation formula.
Under the NPPF
What the result means for a site
The National Planning Policy Framework in force since 17 August 2026. The policy text is quoted word for word.
A result of 95% or more carries none of the Framework's consequences. The test on its own does not deem an unmet need for housing to exist.
On the council’s own figure of 5.26 years (below) the council can demonstrate a five-year supply, so the unmet-need route in policy S5(1)(j) is not open on supply either. Supply figures are often contested at appeal, and a later finding can differ.
In the Green Belt
Policy S5 does not apply in the Green Belt. There the grey belt route in policy GB7(1)(g) needs an evidenced unmet need for the type of development, and footnote 41 defines it for housing as no five-year supply, including any buffer, or a Housing Delivery Test result below 75%.
“Which, in the case of applications involving the provision of housing, means the lack of a five year supply of deliverable housing sites, including the relevant buffer where applicable, or where the Housing Delivery Test result was below 75% of the housing requirement over the previous three years;”
NPPF, Footnote 41, page 63
What it does not do
None of this makes a particular site acceptable. Under policy S5(2), a proposal that fails one of the national policies saying development should be refused in specific circumstances is likely to have its benefits substantially outweighed.
“In applying this policy, the circumstances in which the benefits of approving development proposals are likely to be substantially outweighed by adverse effects include, but are not restricted to, situations where the development proposal would fail to comply with one of the national decision-making policies which state that development proposals should be refused in specific circumstances.”
NPPF, Policy S5(2), page 26
Across the boundary
Councils next to Vale of White Horse
A site near the edge of Vale of White Horse may sit in a neighbouring council, and the figures can differ sharply across the line. Each name opens that council’s page.
| Council | HDT 2025 | Five-year supply | Committee approval rate |
|---|---|---|---|
| Cherwell | 134% 95% or more: no consequence | 3.1 years at 31 March 2025 | 74.3% of 878 |
| Cotswold | 68% Under 75%: unmet need deemed | 1.8 years at 1 April 2024 (out of date) | Not available |
| Oxford | 65% Under 75%: unmet need deemed | 2.88 years at 1 April 2025 | 87% of 761 |
| South Oxfordshire | 171% 95% or more: no consequence | 3.98 years at 1 April 2026 | 79.3% of 947 |
| Swindon | 87% Under 95%: action plan | 4.71 years at 1 April 2026 | 85.4% of 171 |
| West Berkshire | 114% 95% or more: no consequence | Not yet checked | 71% of 655 |
| West Oxfordshire | 104% 95% or more: no consequence | No published figure found | Not available |
| Wiltshire | 93% Under 95%: action plan | Not yet checked | 67.1% of 1,501 |
Councils that share a boundary with Vale of White Horse on the Office for National Statistics’ December 2024 local authority boundaries. Sources for each figure are on each council’s page.
Check a site in Vale of White Horse
Send the site and the first pass reads it against these figures, the settlement boundary, the Green Belt and flood maps, and the decisions on the land around it. Free, within two working days.
Every figure on this page comes from the source linked beside it, as at the date given. Nothing is rounded up. Page built 30 October 2026 from the Housing Delivery Test 2025 results, Searchland’s Committee Explorer export and Land Pass’s council fact-pack. It is decision support, not planning advice.