If we think you should walk away, we will say so. Free first pass, answered in two working days ·  Send a site
Land PassIndependent land checks

Councils · England

Warrington: housing land supply and delivery

Warrington delivered 134% of the homes it needed in the three years to 31 March 2025. That passes the test and carries no consequence, so whether the unmet-need route opens turns on the five-year supply.

134%

Housing Delivery Test 2025

2,735 homes delivered against 2,036 required, 2022-23 to 2024-25

95% or more: no consequence

Housing Delivery Test 2025

Homes needed and homes built

YearHomes requiredHomes built
2022-236791,473
2023-24679673
2024-25679589
Three years2,0362,735

Source: Housing Delivery Test: 2025 measurement, Ministry of Housing, Communities and Local Government, results table (ODS), published 17 August 2026. gov.uk rounds each result to the nearest 1%; the figures here are as published.

At planning committee

Committee approval rate

Committee approval rate

Not available

Warrington is not in Searchland’s export.

Source: Searchland, Committee Explorer, authority export, read 27 October 2026.

The committee approval rate is the share of decisions taken at the council’s planning committee that were approved, in Searchland’s Committee Explorer data. Most applications are decided by officers under delegated powers and never reach the committee, so it is not the council’s overall approval rate, and it is not the chance that a particular site gets permission. The number of decisions behind each rate is given, so that a high rate on a handful of decisions is read for what it is.

From the council’s own documents

Supply, plan and levy

Printed only where Land Pass has read the council’s own document. Each one gives its source and date, and a figure more than a year old says so.

Five-year housing land supply

5.14 years

At 1 April 2025, five years or more on the council’s own figure. The figure is measured against the Local Plan requirement with a 5% buffer; the same table projects 5.01 years for 2026/27 to 2030/31 once a 20% buffer applies from 1 July 2026.

Source: Strategic Housing Land Availability Assessment 2025, published December 2025.

Local plan

Warrington Local Plan 2021/22 – 2038/39

Adopted 4 December 2023.

Warrington has started a new Warrington Local Plan under the new plan-making system. It gave notice on 16 April 2026, ran a scoping consultation and call for sites from 16 April to 1 June 2026, and published its Gateway 1 self-assessment on 21 September 2026. The timetable shows consultation on the plan's content from 17 November 2026 to 4 January 2027, the proposed plan consultation from 19 October to 14 December 2027, submission on 3 July 2028 and adoption on 5 March 2029.

Sources: the adopted plan; Updating Warrington’s Local Plan page, read 25 October 2026; later dates from the Warrington Local Plan Timetable CSV of 21 September 2026, https://www.warrington.gov.uk/sites/default/files/2026-09/Warrington%20Local%20Plan%20Timetable%20-%20%2021%20September%202026.csv. Status checked 25 October 2026.

Community Infrastructure Levy, 2026

No CIL in force

Warrington does not charge CIL; its CIL page says work stopped after the 2015 preliminary draft and that CIL will be introduced alongside a future review of the Local Plan.

Source: Infrastructure Funding Statement (IFS) 2024-25, December 2025.

Under the NPPF

What the result means for a site

The National Planning Policy Framework in force since 17 August 2026. The policy text is quoted word for word.

A result of 95% or more carries none of the Framework's consequences. The test on its own does not deem an unmet need for housing to exist.

On the council’s own figure of 5.14 years (below) the council can demonstrate a five-year supply, so the unmet-need route in policy S5(1)(j) is not open on supply either. Supply figures are often contested at appeal, and a later finding can differ.

The Warrington Local Plan 2021/22 – 2038/39 was adopted on 4 December 2023. Until 4 December 2028, a local housing need figure above the plan's requirement is not, by itself, evidence of unmet need.

“Where a local planning authority can demonstrate a five year supply of deliverable housing sites (with the appropriate buffer) and where the Housing Delivery Test indicates that the delivery of housing is more than 75% of the housing requirement over the previous three years, for the purposes of policy S5(1)(j), if the most up-to-date local housing need figure (calculated using the standard method set out in Annex D) is greater than the housing requirement set out in adopted development plan policies, this should not be considered as evidence of unmet need, for a period of five years from the date of the plan's adoption.”

NPPF, Annex A, paragraph 3, page 99

In the Green Belt

Policy S5 does not apply in the Green Belt. There the grey belt route in policy GB7(1)(g) needs an evidenced unmet need for the type of development, and footnote 41 defines it for housing as no five-year supply, including any buffer, or a Housing Delivery Test result below 75%.

“Which, in the case of applications involving the provision of housing, means the lack of a five year supply of deliverable housing sites, including the relevant buffer where applicable, or where the Housing Delivery Test result was below 75% of the housing requirement over the previous three years;”

NPPF, Footnote 41, page 63

What it does not do

None of this makes a particular site acceptable. Under policy S5(2), a proposal that fails one of the national policies saying development should be refused in specific circumstances is likely to have its benefits substantially outweighed.

“In applying this policy, the circumstances in which the benefits of approving development proposals are likely to be substantially outweighed by adverse effects include, but are not restricted to, situations where the development proposal would fail to comply with one of the national decision-making policies which state that development proposals should be refused in specific circumstances.”

NPPF, Policy S5(2), page 26

Across the boundary

Councils next to Warrington

A site near the edge of Warrington may sit in a neighbouring council, and the figures can differ sharply across the line. Each name opens that council’s page.

CouncilHDT 2025Five-year supplyCommittee approval rate
Cheshire East213% 95% or more: no consequence3.3 years at 31 March 202567% of 1,613
Cheshire West and Chester244% 95% or more: no consequence1.6 years at 1 April 202668.4% of 810
Halton170% 95% or more: no consequenceNo published figure found91.5% of 329
Salford178% 95% or more: no consequence7.1 years at 1 April 202587.6% of 419
St Helens118% 95% or more: no consequence6.07 years at 31 March 202686.4% of 132
Trafford83% Under 85%: 20% buffer and action plan4.7 years at 1 April 2024 (out of date)73.8% of 237
Wigan153% 95% or more: no consequence5.45 years at 1 April 202689.7% of 116

Councils that share a boundary with Warrington on the Office for National Statistics’ December 2024 local authority boundaries. Sources for each figure are on each council’s page.

Check a site in Warrington

Send the site and the first pass reads it against these figures, the settlement boundary, the Green Belt and flood maps, and the decisions on the land around it. Free, within two working days.

Check a site in Warrington

Every figure on this page comes from the source linked beside it, as at the date given. Nothing is rounded up. Page built 30 October 2026 from the Housing Delivery Test 2025 results, Searchland’s Committee Explorer export and Land Pass’s council fact-pack. It is decision support, not planning advice.